
LDV-LDR-1020
Building High-Performance Project Teams
02:48:01·intermediate·3 modules·10 lessons
About this course
About this course
Most project “teams” are working groups in costume: capable specialists, a shared kickoff pack, and no shared performance challenge. When the programme turns, the instinct is to swap out a star. The real fix is usually a team-system move.
Building High-Performance Project Teams is a practical Leadership Vault course (~2.5–3 hours) for project directors, PMs, package leads and PMC leads who assemble and lead multi-party teams on capital works. Through the Kilnarrow Viaduct Renewal case, you learn to tell a working group from a real team, run a real-team launch gate, frame a team-specific performance challenge, put one Accountable name on every interface, build vulnerability-based trust and psychological safety, and — when delivery drifts — diagnose with the Project Team Performance Model and run a mid-project reset instead of blaming individuals.
What you will learn
- Spot when a roster is still a working group, and what a launch gate must prove before day one.
- Frame a results-based performance challenge the team can recite — not a charter restatement.
- Hand down decision rights with exactly one Accountable per interface (“I intend to…”).
- Build trust and psychological safety so near-misses surface the day they happen.
- Hold peer accountability and structured collaboration when pressure rises.
- Diagnose mid-flight with the Project Team Performance Model and reset the team system, not the person.
Who should take this course?
Project directors, project managers, package leads, PMC leads and delivery leaders assembling multi-organisation teams on infrastructure and capital programmes. Working familiarity with project delivery is assumed; no prior team-science training is required.
What is not covered?
Virtual/hybrid team design, team incentives and reward systems, conflict-style instruments, detailed coaching skills, team ROI measurement, and succession after close-out. Those remain separate topics.
What you will cover
01Module 1 · From Roster to Real Team
- Why High-Performance Project Teams — and Where Most "Teams" Actually Sit
- Working Group or Real Team? The Performance Curve and the Launch Gate
02Module 2 · The Team Operating System
- Shared Purpose: From Charter Restatement to Performance Challenge
- Roles and Decision Rights: One Accountable per Interface
- Vulnerability-Based Trust and Psychological Safety
- Accountability, Collaboration, and the Mid-Project Reset
03Module 3 · Toolkit, Challenge and Assessment
- The Project Team Toolkit: Diagnose, Launch, Reset
- Project Leadership Challenge: The Kilnarrow Viaduct Renewal
- Case Debrief: What Kilnarrow Was Really Teaching
- Final Assessment: Building High-Performance Project Teams
More in Leadershipvault
- LDV-DCM-1070

Leading the Decision Frame: Problem Definition Before Options
Name the decision you are actually making, own its frame, and structure the problem — before options, estimates, or analytics decorate the wrong question.
03:31:46Intermediate - LDV-DCM-1090

Build the Owner Team That Can Run the Job
About this course Six months before the authorisation gate, the project director walks her owner team and finds one seat that matters most standing empty — operations. The engineer…
03:33:01Advanced - LDV-DCM-1080

Bias in Megaprojects: Why Smart Teams Make Bad Project Decisions
About this course Most transport megaprojects miss cost at the decision to build — and the people responsible were not fools. Scale, uniqueness, longevity and politics make megapro…
04:55:28Advanced - LDV-LDR-1060

Empowerment That Does Not Break the Project
About this course A crane rail sits inside a tolerance argument for eleven days. The hold point fails its first audit, crane erection slips against a customs critical berth window,…
02:10:00Advanced