About this course

A practical course on navigating extreme events in construction projects—from the first disruption to a defensible relief package.

Storms, epidemics, ground conditions, supply disruption, and government action can place a construction project under extraordinary pressure. But an extreme event does not automatically create a right to relief. The outcome depends on the contract, the nature of the event, causation, foreseeability, notice, mitigation, and the quality of the records supporting the claim.

This course gives construction professionals a structured way to route an event through the right relief mechanism, protect entitlement, and build a defensible record.

The Case

The course follows a live construction scenario in which a typhoon crosses a container berth project with a fixed opening deadline. What begins as a single extreme weather event develops into a wider relief problem involving an epidemic-driven crew shortage, abnormal wet-season weather, and unexpected siltation at the berth.

Each event presents a different contractual question.

Is it force majeure? A relief event? A physical-condition claim? Or does it potentially reach the much narrower territory of frustration?

The course follows the case as these questions are tested, notices are served, records accumulate, mitigation measures are taken, and the commercial consequences of different relief positions become clearer.

Three Lessons

Lesson 1 — When the Contract Meets the Storm

Learn to distinguish force majeure, relief events, and frustration, and understand what each route can and cannot excuse. You will apply a practical control–foreseeability–causation screen to determine whether an extreme event qualifies for relief and route it through the contract's own provisions.

Lesson 2 — Notice, Records and the Relief Event

A good event can still produce a weak claim if the notice and record fail. Learn how to build a relief-event file covering condition-precedent notices, continuing notices, mitigation evidence, and contemporaneous records. You will also evaluate the real cost of accepting time-only relief, including standby, remobilisation, acceleration, and liquidated-damages exposure.

Lesson 3 — Epidemics, Weather and Ground Conditions

Not every disruption follows the same relief route. Learn to distinguish epidemic-related shortages, abnormal weather, and unforeseeable physical conditions, and understand why each requires different evidence. You will use a practical triage approach to connect the event, contractual route, available relief, and supporting records before assembling the final relief package.

What You Will Learn

By the end of the course, you will be able to:

  • Distinguish force majeure, relief events, and frustration.
  • Assess control, foreseeability, and causation.
  • Build a defensible notice and records file.
  • Manage continuing-event notices and mitigation evidence.
  • Evaluate time-only versus time-and-money relief.
  • Triage epidemic, weather, and ground-condition events.
  • Connect relief events to critical-path effects.
  • Assemble an integrated entitlement, notice, mitigation, and records package ready for submission or defence.

The practical discipline is simple:

route the event → serve the notice → build the record → mitigate the impact → package the relief.

What you will cover

  1. 01When the Contract Meets the Storm

  2. 02Notice, Records and the Relief Event

  3. 03Epidemics, Weather and Ground Conditions